construction in costa rica

construction in Costa Rica

Starting your project in Costa Rica

As someone who has designed and overseen projects throughout our beautiful country, let me share what you really need to know before starting a construction here.

1. Permitting - Patience is Key

Actually the process is not that bad, it takes time though, like anywhere else, and you must plan on that. When your architect finishes the blueprints, it will still take a couple of months before you can break ground. Here’s the real deal: yes, the constructions documents or blueprints have to go through the CFIA first, but they are pretty efficient, in a couple of days most likely they’re done reviewing the project. After that, the blueprints go through other entities and finally through the city hall, this process could take a couple of months on average, but the secret is starting early. I usually begin the permit process months before planned construction. Don’t try to rush it – that’s when you’ll hit walls. It’s always better to wait for the permits to come out before breaking ground, some contractors like to rush the process and start early, but the risk of having the project stopped and fined is too high and not worth it, better start with the right foot.

Two wooden chairs and a round table with a wine bottle and glasses, overlooking a scenic ocean view with an island in the background.

2. Understanding Our Land

Listen carefully – Costa Rica is a very small country yes, but it’s also very rich as in microclimate and topography rich.

I’ve had clients come to me with beautiful beachfront lots, not realizing they’re in the Maritime Zone with heavy restrictions, plus floods are a high risk when you want to build almost right on the beach. Others buy mountain properties without understanding how construction works for slopes, which by the way is very different than flat lands. Before you even think about design, let’s make sure your land is buildable the way you want. And please, get a proper survey, no matter how many times people say you don’t need it, you should get the survey before you even buy the property, I’ve seen too many boundary disputes that could have been avoided.

3. Working With Nature, Not Against It

In my years of practice, I’ve learned that the most successful projects embrace our environment rather than fight it. This means:

– Designing for our heavy rains (and believe me, when I say heavy, I mean HEAVY)

– Creating proper air flow

– Using generous overhangs to protect from both sun and rain

– Incorporating local materials that withstand our climate

dining glass table with chairs on an ocean view balcony

4. The Weather Reality

Let me be honest – construction here follows nature’s schedule, not yours. During rainy season, which is almost half of the year here, expect delays. It’s not that we don’t want to work; it’s that some things just aren’t possible or safe when it’s pouring. I always tell my clients to add 20% to their timeline for weather delays. It’s better to be pleasantly surprised than constantly frustrated.

build relationships with your crew

5. Working with Local Labor

Okay, this is super important to learn from the beginning, our construction workers are skilled and hardworking, but our work culture is different. Some tips from years of experience:

– Build relationships with your crew, understand that they are helping you as much as you are helping them, it goes both ways, plus they are human beings and deserve respect, just like you and me. 

– Provide good coffee and occasional meals (un cafecito goes a long way)

– Remember that many workers travel far to reach sites

– Respect holidays – trying to work through Christmas or Semana Santa is usually counterproductive

A partially constructed building with a red metal roof and exposed steel framework, situated near trees and other construction materials.
A partially constructed concrete block retaining wall with visible rebar, set against an earth embankment, surrounded by construction debris and plant foliage.

6. Materials and Methods

Here’s something crucial: forget everything you know about construction materials from abroad. Our methods are adapted to our environment:

– We use more concrete and block than wood (termites are real, my friends, and if you use wood, you have to make sure it is the right wood, not just any wood would withstand our harsh weather conditions)

– Certain imported materials can be cost-prohibitive

– Local alternatives often work better for our climate

– Some “green” materials popular elsewhere don’t hold up here, for example bamboo here requires a lot of maintenance, it gets moldy very quickly.

8. The Real Budget Talk

Let’s be direct about money:

– Add 15% contingency minimum for your overall budget

– Consider import taxes on specialty items

– Plan for rainy season delays

– Include permit costs and legal fees

– And don’t forget that costs are constantly rising.

Modern house with large windows and a sloped roof, surrounded by lush greenery on a hillside.

9. Timeline Expectations

In my experience, successful projects follow this general timeline:

– Design and permits: 4-6 months

– Basic house construction: 6-8 months

– Luxury home construction: 8-12 months

And remember, these are optimistic timelines and not taking into consideration the heavy rains!

10. The Cultural Factor

This might be the most important point. Construction success here isn’t just about technical expertise – it’s about understanding our way of doing things:

– Building relationships matters more than rigid schedules

– Flexibility is crucial

– Aggressive behavior gets you nowhere

– Respect for our environment isn’t optional

– Community relations can make or break a project

Modern two-story house with a flat roof surrounded by lush greenery. Features large windows, balconies, and a central pergola.

a Final Advice

After years of working with both local and foreign clients, I can tell you that the most successful projects are those where clients embrace our Costa Rican way of building. Yes, it might be different from what you’re used to, but our methods have evolved to work with our unique environment and culture, and they really work.

Remember, we’re not just building a structure – we’re creating something that needs to work in harmony with our environment, our communities, and our way of life. If you can embrace this philosophy, you’ll find the construction process much more enjoyable and successful.

Also, if you would like to learn about the permitting process in Costa Rica for a new construction, follow the link to my next blog post, where I describe the process in detail:

Construction permits in costa rica

Pura Vida y buena suerte!